SAP GRC Migration from 5.3 to 10: Step by Step Configuration Guide

This document contains the migration steps of GRC Access Control from 5.3 to 10.1 SP4 version in SAP. Before starting the migration, check the AC 10.1 is properly installed which also includes the plug-ins on all AC backend systems. Upgrade the AC 5.X server to AC 5.3 SP20 level. The following steps describe the migration process which is covered in detail.

  1. Complete the Pre-requisites
  2. Export the SPM data
  3. Export the configuration, master, and transactional data (AC 5.3 only). Then copy the exported data to the import location
  4. Import the common configuration data into AC 10.1
  5. Complete the intra-migration tasks
  6. Import the application data into AC 10.1
  7. Complete the post-import tasks.
  8. Validate the data

Read more

SAP PS End User Manual: Step by Step

This manual for SAP Project Systems (PS) module contains all essential information for the end-users to make full use of the system. This manual includes a description of the system with step-by-step procedures explained of the following topics;

  • Basics of Project System in R/3
  • Project Process Flow
  • Create Project Template
  • Create Standard Network
  • Create Project Structure
  • Create Cost Planning
  • Project Scheduling
  • Assigning Material to Project
  • Assigning Service Activities to project
  • Project Budgeting
  • Release Budget
  • Document Management System
  • Project Release for Execution
  • Purchase Requistion Process
  • MRP Run on Project / WBS
  • Project Closing