MATERIAL |
|
|
CREATE-GENERAL |
MM01 |
IMMEDIETELY |
|
MM11 |
SCHEDULE |
CHANGE |
MM02 |
IMMEDIETELY |
|
MM12 |
SCHEDULE |
|
MM13 |
ACTIVATE |
FLAG FOR DELETION |
MM06 |
IMMEDIETELY |
|
MM16 |
SCHEDULE |
DISPLAY |
MM03 |
DISPLAY CURRENT |
|
MM19 |
DISPLAY AT KEY DATE |
DISPLAY CHANGES |
MM04 |
ACTIVE CHANGES |
|
MM14 |
SCHEDULE CHANGES |
|
MM17 |
MASS MAINTENANCE |
|
MMAM |
CHANGE MATERIAL TYPE |
OTHER |
MMBE |
STOCK OVERVIEW |
|
MMPV |
CLOSE PERIOD |
|
MMRV |
ALLOW POSTING TO |
|
|
PREVIOUS PERIOD |
|
MM50 |
INSTANT MATERIAL VIEW |
|
MMSC |
ENTER STORAGE LOCATIONS |
|
MM60 |
MATERIAL LIST |
ARCHIVING(MATERIAL) |
MM71 |
ARCHIVE/DELETE |
|
MM72 |
DISPLAY ARCHIVE |
BILL OF MATERIAL (MATERIAL BOM) |
|
|
|
CS01 |
CREATE |
|
CS02 |
CHANGE |
|
CS03 |
DISPLAY |
EXTRAS |
CS28 |
ARCHIVING |
|
CS20 |
MASS CHANGES |
EVALUATION/BOM |
CS11 |
BOM MULTILEVEL |
EXPLOSION/MATERIAL |
CS12 |
STRUCTURE MULTILEVEL |
BOM |
CS13 |
SUMMURISED BOM |
WORK CENTRES |
|
|
|
CR01 |
CREATE |
|
CR02 |
CHANGE |
|
CR03 |
DISPLAY |
|
CA85 |
REPLACE |
CAPACITY |
CR11 |
CREATE |
|
CR12 |
CHANGE |
|
CR13 |
DISPLAY |
HIERARCHY |
CR21 |
CREATE |
|
CR22 |
CHANGE |
|
CR23 |
DISPLAY |
LINE HIERARCHY |
LDB1 |
CREATE |
|
LDB2 |
CHANGE |
|
LDB3 |
DISPLAY |
REPORTING |
CR60 |
W/C INFORMATION SYSTEM |
|
CR05 |
W/C LIST |
|
CR06 |
COST CENTRE ASSIGNMENT |
|
CR07 |
W/C CAPACITIES |
|
CR08 |
W/C HIERARCHY |
WHERE USED |
CA80 |
WORK CENTRE |
|
CR15 |
CAPACITY |
|
CR10 |
CHANGE DOCUMENTS |
EXTRAS |
CR09 |
STD. TEXTS TASK LIST |
|
CR41 |
ARCHIVING |
ROUTING |
|
|
STAD. ROUTING |
CA01 |
CREATE |
|
CA02 |
CHANGE |
|
CA03 |
DISPLAY |
REF. OPERATION SETS |
CA11 |
CREATE |
|
CA12 |
CHANGE |
|
CA13 |
DISPLAY |
RATE ROUTING |
CA21 |
CREATE |
|
CA22 |
CHANGE |
|
CA23 |
DISPLAY |
REF. RATE ROUTING |
CA31 |
CREATE |
|
CA32 |
CHANGE |
|
CA33 |
DISPLAY |
EXTRAS |
CA85 |
REPLACE W/C |
MASS CHANGES |
CA95 |
REPLACE REF. OP. SET |
|
CA75 |
REPLACE PRT |
DELETE TASK LIST |
CA99 |
WITH ARCHIVING |
|
CA98 |
W/O ARCHIVING |
REPORTING |
CA80 |
WORK CENTRE |
WHERE USED LIST |
CA90 |
REF. OP. SETS |
|
CA70 |
PRODUCTION RESORCE TOOLS |
COST CENTRE |
|
|
|
OKKP |
MAINTAIN CONTROLLING AREA |
|
KS01 |
CREATE COST CENTRE |
|
KZS2 |
CREATE COSTING SHEET |
|
KA01 |
CREATE PRI. COST ELEMENT |
|
KA06 |
CREATE SEC. COST ELEMENT |
|
KL01 |
CREATE ACTIVITY TYPE |
|
KP26 |
ACTIVITY TYPE/PRICE PLANNING |
SALES AND OPERATIONS PLANNING |
|
|
PRODUCT GROUP |
MC84 |
CREATE |
|
MC86 |
CHANGE |
|
MC85 |
DISPLAY |
GRAPHIC |
MC91 |
PRODUCT GROUP |
|
MC92 |
OVERVIEW |
PLANNING |
MC81 |
CREATE |
FOR PRODUCT GROUP |
MC82 |
CHANGE |
|
MC83 |
DISPLAY |
|
MC75 |
TRANSFER PG TO PLANNING |
FOR MATERIAL |
MC87 |
CREATE |
|
MC88 |
CHANGE |
|
MC89 |
DISPLAY |
|
MC74 |
TRANSFER MATERIALS TO |
|
MC9K |
MATERIAL AVAILABILITY |
VERSION MANAGEMENT |
MC78 |
COPY |
|
MC80 |
DELETE |
FLEXIBLE PLANNING |
MC93 |
CREATE |
PLANNING |
MC94 |
CHANGE |
|
MC95 |
DISPLAY |
|
MC9K |
MATERIAL AVAILABILITY |
TOOLS/PLANNING TYPE |
MC8A |
CREATE |
MACRO |
MC8B |
CHANGE |
|
MC8C |
DISPLAY |
EVENT |
MC64 |
CREATE |
|
MC65 |
CHANGE |
|
MC66 |
DISPLAY |
ROUGH CUT PLANNING |
MC35 |
CREATE |
PROFILE |
MC36 |
CHANGE |
|
MC37 |
DISPLAY |
ENVIRONMENT |
MC90 |
TRANSFER MATERIALS TO DM |
ACTIVITY REQT. |
KSPP |
TRANSFER TO COST CENTRE |
|
KSBL |
COST CENTRE PLANNING REPORT |
|
KSOP |
TRANSFER TO ACTIVITY BASED COSTING |
|
CPBL |
PLANNING REPORT PROCESSES |
|
MC9C |
REPORTING |
SETTINGS |
MC96 |
FORECAST PROFILE |
DISSAGGRIGATION |
MC76 |
BREAKDOWN PG PLAN |
|
MC77 |
DISPLAY PG PLAN |
|
MC75 |
TRANSFER PG TO PLANNING |
|
MC74 |
TRANSFER MATERIALS TO DM |
FORECASTING |
|
|
INDIVIDUAL FORECAST |
MP30 |
EXECUTE |
|
MP31 |
CHANGE |
|
MP32 |
DISPLAY |
TOTAL FORECAST |
MP38 |
EXECUTE |
|
MP33 |
REPROCESS |
|
MP39 |
PRINT |
|
MPBT |
EXECUTE BACKGROUND |
|
MPDR |
PRINT BACKGROUND |
DEMAND MANAGEMENT |
|
|
PIR |
MD61 |
CREATE |
|
MD62 |
CHANGE |
|
MD63 |
DISPLAY |
|
MD65 |
REQTS. FOR SCINARIO |
|
MD66 |
COPY SIMULATED DEPENDENT REQT. |
|
MD70 |
COPY TOTAL FORE CAST |
EVALUATION |
MD73 |
DISPLAY TOTAL REQT. |
|
MD79 |
EXCELL INTERFACE |
|
MD4C |
ORDER REPORT |
|
MD72 |
CHARECTERISTICS PLANNING |
CUSTOMER REQT. |
MD81 |
CREATE |
|
MD82 |
CHANGE |
|
MD83 |
DISPLAY |
REPETITIVE MANUFACTURING |
|
|
MASTER DATA |
C223 |
PRODUCTION VERTION |
PRODUCT COST PLANNING |
|
|
COSTING RUN |
CKMATSEL |
CREATE |
SELECTION LIST |
CKMATCON |
Edit |
|
CK40N |
EDIT COSTING RUN |
Master Data |
MD25 |
Create planning calendar |
|
MD26 |
Change planning calendar |
|
MD27 |
Display planning calendar |
|
MDSA |
Display BOM explosion number |
|
MDSP |
Edit BOM explosion number |
|
MEQ1 |
Maintain quota file |
|
OPPP |
Explode BOM by date |
|
MDUS |
Display project assignment |
|
MDUP |
Process project assignment |
|
MDL1 |
Create production lot |
|
MDL2 |
Change production lot |
|
MDL3 |
Display production lot |
Planning |
MD20 |
Create planning file entry |
|
MD21 |
Display planning file entry |
|
MDAB |
Set up planning file entry in background |
|
MDRE |
Check planning file entry |
|
MD01 |
Total planning online |
|
MDBT |
Total planning in background |
|
MD03 |
Single-item, single-level planning |
|
MD02 |
Single-item, multi-level planning |
|
MD43 |
Interactive single-item planning |
|
MD50 |
Multi-level, make-to-order planning |
|
MD51 |
Multi-level project planning |
|
MF52 |
Display planning table |
|
MF50 |
Change planning table |
|
MF57 |
Planning table by MRP lists |
|
MF51 |
Planning table by production list |
Evaluations |
MD04 |
Stock/requirements list |
|
MD07 |
Collective access of stock/requirements lis |
|
MD05 |
MRP list |
|
MD06 |
Collective access of MRP lists |
|
MDLD |
Print MRP list |
|
MD45 |
Planning result |
|
MD46 |
Collective access of planning result |
|
MD44 |
Planning situation for a material |
|
MD47 |
Planning situation for a product group |
|
MD48 |
Cross-plant planning situation |
|
MD4C |
Order report |
|
MD09 |
Pegged requirements |
|
CO46 |
Order progress |
Planned Order |
MD11 |
Create planned order |
|
MD12 |
Change planned order |
|
MD13 |
Individual access of planned order |
|
MD16 |
Collective access of planned orders |
|
MD14 |
Individual conversion of planned order into |
|
MD15 |
Collective conversion of planned orders int |
|
MDUM |
Convert planned order into purchase requisi |
|
CO40 |
Convert individual planned order into produ |
|
CO41 |
Collective conversion of planned orders int |
|
CO48 |
Partial conversion of planned order into pr |
|
COR7 |
Individual conversion of planned order into |
|
COR7_PC |
Collective conversion of planned orders int |
|
COR8 |
Partial conversion of planned order into pr |
|
MDVP |
Collective availability check |
|
MDAC |
Execute action for planned order |
LONG TERM PLANNING |
|
|
PALNNING SCENARIO |
MS31 |
CREATE |
|
MS32 |
CHANGE |
|
MS33 |
DISPLAY |
PLANNING RUN |
MS01 |
ON LINE |
|
MSBT |
SA BACKGROUND JOB |
|
MS02 |
SINGLE ITEM – MULTI LEVEL |
|
MS03 |
SINGLE ITEM – SINGLE LEVEL |
|
MS50 |
SINGLE ITEM – SALES ORDER |
|
MS51 |
SINGLE ITEM PLANNING, PROJECT |
|
MFSO |
PLANNING TABLE |
EVALUTIONS |
MS05 |
MRP LIST MATERIAL |
|
MS06 |
MRP LIST COLLECTIVE DISPLAY |
|
MSLD |
PRINT MRP LIST |
|
MS04 |
STOCK/REQUIREMENTS LIST |
|
MS07 |
STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY |
|
MS44 |
PLANNING SITUATION MATERIAL |
|
MS47 |
SITUATION PRODUCT GROUP |
MPS-MASTER SCHEDULE |
ITEMS |
|
TOTAL PLANNING |
MD40 |
ON LINE |
|
MDBS |
SA BACKGROUND JOB |
|
MD41 |
SINGLE ITEM – MULTI LEVEL |
|
MD42 |
SINGLE ITEM – SINGLE LEVEL |
|
MD43 |
SINGLE ITEM – INTERACTIVE |
|
MD50 |
SINGLE ITEM – SALES ORDER |
|
MD51 |
SINGLE ITEM PLANNING, PROJECT |
*** EVALUTION IS SIMILAR TO MRP |
|
|
PRODUCTION CONTROL |
|
|
ORDER – CREATE |
CO01 |
WITH MATERIAL |
|
CO07 |
WITHOUT MATERIAL |
|
CO40 |
FROM PLANNED ORDER |
|
CO41 |
COLLECTIVE CONVERTION OF PLANNED ORDER |
|
CO08 |
FOR SALES ORDER |
|
CO10 |
FOR PROJECT |
|
CO02 |
CHANGE |
|
CO03 |
DISPLAY |
CONTROL |
MD04 |
STOCK/REQUIREMENTS LIST |
|
COHV |
MASS PROCESSING |
|
COMAC |
COLLECTIVE AVAILABILITY CHECK |
|
CO05N |
COLLECTIVE RELEASE |
|
CO04N |
PRINT |
|
CO09 |
AVAILABILITY OVER VIEW |
GOODS MOVEMENT |
MF65 |
STOCK TRANSFER FOR RESERVATION |
MATERIAL STAGING |
MF68 |
LOG |
|
MB1A |
GOODS ISSUE |
|
MB31 |
GOODS RECEIPT |
|
COWBPACK |
PACK MATERIAL |
CONFIRMATION |
CO1V |
TIME TICKET |
FOR OPERATION |
CO14 |
DISPLAY |
|
CO13 |
CANCEL |
|
CO1L |
REQUESTED CONFIRMATIONS |
|
CO1P |
PREDEFINED PROCESSES |
TOOLS-ARCHIVING |
CO78 |
ORDER |
|
KOAA |
SETTELMENT DOCUMENTS |
CAPACITY PLANNING |
|
|
EVALUTION |
CM01 |
LOAD |
|
|
|
WORK CENTER VIEW |
CM02 |
ORDERS |
|
CM03 |
POOL |
|
CM04 |
BACKLOG |
|
CM05 |
OVERLOAD |
|
CM07 |
VARIABLE |
EXTENDED EVALUTION |
CM50 |
WORK CENTER VIEW |
|
CM51 |
INDIVIDUAL CAPACITY VIEW |
|
CM52 |
ORDER VIEW |
LEVELLING |
CM21 |
PLANNING TABLE (GRAPHICAL) |
WORK CENTER VIEW |
CM22 |
PLANNING TABLE (TABULAR) |
INDIVIDUAL CAPACITY |
VCM27 |
PLANNING TABLE (GRAPHICAL) |
|
CM28 |
PLANNING TABLE (TABULAR) |
ORDER VIEW |
CM31 |
PLANNING TABLE (GRAPHICAL) |
|
CM32 |
PLANNING TABLE (TABULAR) |
AVAILABLE CAPACITY |
CR12 |
CHANGE |
CAPACITY |
CR13 |
DISPLAY |
|
OP4A |
SHIFT SEQUENCE |
|
OP43 |
FACTORY CALENDER |