SAP GUI 7.50 is uploaded and added to links.
CATEGORY WISE POSTS
Browse latest posts of popular categories below
Browse all latest posts by category and date wise here!
SAP GUI 7.50 is uploaded and added to links.
Browse latest posts of popular categories below
Browse all latest posts by category and date wise here!
SAP HCM Time Management User Manual
This Time Management training manual provides a detailed explanation of all procedures that are performed within a day or routinely on the SAP HCM system. After completing this manual, you will be able to handle these daily procedures professionally.
Upon completion of this course, process users will be familiar and know the following activities:
Read more →
SAP Variant Configuration Guide for Steel Manufacturing Industry
This SAP Variant Configuration document talks about how consultants designing SAP solutions for steel companies have to deal with the additional challenge of managing the master data due to the multitude of features that characterize steel industry products. The large number of product feature combinations translates into massive amounts of products leading to huge master data. The guide then goes on to explain how utilizing SAP variant configuration functionality significantly reduces the master data and facilitates in the master data maintenance. Finally, it covers the factors that played a decisive role in designing the variant configuration functionality for steel manufacturing company, including product structure design, planning strategy design, setting up master data design, costing design and variant pricing design for variant configuration. At the end it provides important transaction codes used in Variant Configuration.
Read more →
Optimizing ABAP for SAP HANA: A Three-Step Approach
ABAP is an integral part of SAP customer and partner environments, with a vast amount of business-critical data present in ABAP-based systems such as SAP Business Suite, SAP NetWeaver Business Warehouse (SAP NetWeaver BW), and on-demand offerings from SAP. These environments can benefit from the accelerated processing and analysis supported by SAP’s in-memory database technology offering, SAP HANA. Applications that use SAP HANA follow the “code to data” paradigm in which calculation logic is pushed down from the application server to the database server. The SAP HANA database then performs the calculations and sends the resulting data set back for use by an application. Operations that require high-performance access to mass data can be delegated to SAP HANA while operations used to manage and integrate business processes remain on SAP Net Weaver AS ABAP. Finally, SAP has developed a staged, three-step approach to optimizing SAP NetWeaver AS ABAP for SAP HANA that will help customers and partners gradually integrate in-memory innovation without risking their existing implementations.
After reading this document, you will be able to:
Read more →
16 Steps Required to Maintain Investment Measures in SAP S/4 HANA
Organizational activities are often managed as projects that involve design, plan, build, and assign phases. Choosing between using an internal order or WBS element as an investment measure depends on the project’s complexity and the number of stages involved. SAP S/4 HANA Internal order (CO-IO) or Project System (PS) can be used to monitor multiple module projects with complex structures.
In this document, the essential settings required for using a CO-IO Internal Order as an investment measure in SAP S/4 Investment Management (IM) will be covered. Common configurations like settlement profiles, allocation structures, etc., were covered, and 10-specific configurations like project profiles, how to assign an investment profile to a project profile, etc., will also be covered in this guide.
Read more →