SAP HCM Time Management User Manual

This Time Management training manual provides a detailed explanation of all procedures that are performed within a day or routinely on the SAP HCM system. After completing this manual, you will be able to handle these daily procedures professionally.

Upon completion of this course, process users will be familiar and know the following activities:

  • Record Working time and Processing
    • Create Work/ Shift schedules
    • Change Work/ Shift schedules
    • Display Work/ Shift schedules
  • Master data: This process describes the methods available to enter employees’ time data. Time entry process covers below business scenarios:
    • Personal Work Schedule
    • Attendance/Absence data overview
    • Quota Overview
    • Cumulated Time Evaluation Results
    • Display Absence Quota Information
  • Processing Time This includes:
    • Maintaining time data
    • Absence Administration

Read more

SAP Variant Configuration Guide for Steel Manufacturing Industry

This SAP Variant Configuration document talks about how consultants designing SAP solutions for steel companies have to deal with the additional challenge of managing the master data due to the multitude of features that characterize steel industry products. The large number of product feature combinations translates into massive amounts of products leading to huge master data. The guide then goes on to explain how utilizing SAP variant configuration functionality significantly reduces the master data and facilitates in the master data maintenance. Finally, it covers the factors that played a decisive role in designing the variant configuration functionality for steel manufacturing company, including product structure design, planning strategy design, setting up master data design, costing design and variant pricing design for variant configuration. At the end it provides important transaction codes used in Variant Configuration.
Read more

Optimizing ABAP for SAP HANA: A Three-Step Approach

ABAP is an integral part of SAP customer and partner environments, with a vast amount of business-critical data present in ABAP-based systems such as SAP Business Suite, SAP NetWeaver Business Warehouse (SAP NetWeaver BW), and on-demand offerings from SAP. These environments can benefit from the accelerated processing and analysis supported by SAP’s in-memory database technology offering, SAP HANA. Applications that use SAP HANA follow the “code to data” paradigm in which calculation logic is pushed down from the application server to the database server. The SAP HANA database then performs the calculations and sends the resulting data set back for use by an application. Operations that require high-performance access to mass data can be delegated to SAP HANA while operations used to manage and integrate business processes remain on SAP Net Weaver AS ABAP. Finally, SAP has developed a staged, three-step approach to optimizing SAP NetWeaver AS ABAP for SAP HANA that will help customers and partners gradually integrate in-memory innovation without risking their existing implementations.
After reading this document, you will be able to:

  • Know about the basics of SAP ABAP and SAP HANA
  • Optimization techniques for SAP HANA Database
  • How to access SAP HANA through ABAP applications
  • Basics for migrating ABAP code to SAP HANA
  • Different performance and functional checks
  • About different performance analyzer tools

Read more

16 Steps Required to Maintain Investment Measures in SAP S/4 HANA

Organizational activities are often managed as projects that involve design, plan, build, and assign phases. Choosing between using an internal order or WBS element as an investment measure depends on the project’s complexity and the number of stages involved. SAP S/4 HANA Internal order (CO-IO) or Project System (PS) can be used to monitor multiple module projects with complex structures.
In this document, the essential settings required for using a CO-IO Internal Order as an investment measure in SAP S/4 Investment Management (IM) will be covered. Common configurations like settlement profiles, allocation structures, etc., were covered, and 10-specific configurations like project profiles, how to assign an investment profile to a project profile, etc., will also be covered in this guide.

  1. What is AUC
  2. Create AUC Asset Class
  3. Create Allocation Structure
  4. Create Settlement Profile and Assign Allocation Structure with Settlement Profile
  5. Create Planning Profile
  6. Create Budget Profile
  7. Create Order Type and Assign Budget Profile, Settlement Profile and Planning Profile
  8. Create Investment Profile
  9. Create IO as well as AUC
  10. Create PO with Account Assignment “F” (Order) in ME21N
  11. Post GR in MIGO and Invoice in MIRO
  12. Create Main Asset Class [OAOA]
  13. Create Main Asset master [AS01]
  14. Settlement with AUC KO88
  15. Settlement with Fixed Asset [KO88]
  16. Check the AUC and FA [AW01N]

Read more